Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Incinérateur

Carburant Diesel
Capacité (M3) 1.18
Ave Capacity 750 kg
Consommation (l/h) 6
Dimension externes
Longueur (mm) 3110
Largeur (mm) 1800
Hauteur (mm) 3300
Ouverture Porte 770×2000
Dimension internes
Longueur (mm) 2100
Largeur (mm) 700
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire secs
garantie minimum 12 mois

Incinérateurs

Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois

TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (50 – 60kg/hr)

COMPLIANCE (YES, NO or COMMENT)
Item

Description

Medical Waste Incinerator, 50 to 60

Kg/hr

Item Quantity 5 No.
Support Health Sector Support Project
Point of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals
1.     General Description

Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.   The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material.

 
2.   Composition

2.1     Main unit

2.2   Accessories

 
3.   Performance specifications  
3.1 Main unit    
3.1.1 Application For incineration, general and pathological
3.1.2 Capacity 50 – 60 kg/h burn rate
3.1.3

 

Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4 Operating time Minimum 8 hours daily
3.1.5 Operating temperature From 850 0C to 1200 0C, Automatic controlled
3.1.6 Residual Ash 5 to 10%
   3.2       Primary Chamber
3.2.1

 

Construction Constructed from heavy duty mild or aluminized steel Or

equal and approved equivalent

3.2.2

 

Insulation material Refractory material lining similar or equal to calcium

Silicate and hot face combination of heavy duty brickwork

3.2.3

 

Internal Construction Fixed hearth type complete with gratings, concave bottom

and charging door, lined with refractory material

3.2.4

 

Charging Door Suitable for manual loading of wastes and with smooth

Dear seal equivalent of Ceramic seals with hinges.

3.2.5 Door Lock Automatic, Electric type
3.2.6

 

Ash removal door Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
3.2.7 Gratings Provided
3.2.8 Loading Manual loading of waste
3.2.9

 

Primary Burner Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure, Diesel fired fuel injector type and Flange mounted
3.2.10

 

Blower Provided. For supplying excess combustion air through the distribution system with speed control system
3.2.11 Temperature Minimum exit 850 0C
3.2.12 Observation port To be provided with protective glass type
3.3       Secondary chamber
3.3.1

 

Construction Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2

 

Insulation Refractory material lining
3.3.3

 

Combustion Temperatures Above 850 0C, controlled electronically
3.3.4

 

Gas residue or retention Time > 2 second at minimum 850 0C  
3.3.5

 

Secondary Burner Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                   Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                   Flange mounted
3.3.6 Ejector Provided, Venturi type, for cooling the flue gases
3.3.7

 

Combustion Air Fan Provided for supplying combustion and creating a negative drift and turbulences
3.3.8 Temperature Maximum 1600 0C
   3.4       Chimney
3.4.1

 

Construction Constructed from heavy duty mild or aluminized steel   or equal and approved equivalent                                                                   Refractory material lining
3.4.2 Length 10 m above ground
3.4.3 Bore about 350mm diameter
3.4.5 Discharge temperatures About 850 0C
3.4.6 Emissions To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
   3.5         Electrical System
3.3.5

 

Control unit Fully automatic with microprocessor based control                                                                       unit (PLC) automating all operations of the                                                                       incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress

Parameters i.e. temperature of primary and secondary chambers, turbulence and time

With status lamp

With user of defined and differed programmed operating cycles for different type of loads/conditions

With safety interlocks, display of errors and visible and audio alarms.

System for continuous emission monitoring

3.5.2

 

Isolator switch Supply and install isolator switch 240V, 100A for the                                                                     incinerator unit, including all necessary cables 10m
3.5.3

 

Distribution Board Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring     to be done according IEE regulations.
3.5.4

 

Wiring Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                         Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6     Fuel System Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
3.6.1

 

Fuel Tank Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type Diesel
3.6.2

 

Fuel Lines Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.

Working length , 20m

Fuel pipe material; Special copper pipes or similar                                                                         and approved materials

4               Physical characteristics  
4.1 Main unit Floor mounted, stand alone, fixed hearth type
Dimensions About 1.2 x 2.2m (WxD)
5   Operating environment    
5.1 Power Requirements 240V,A/C 50Hz, single phase, with PE
Ambient temperature 10 0C to 40 0C
Relatively humidity 40% to 90%
6. Accessories  
Rack, 2 m long 1 piece
6.1 Waste cart, stainless steel 1 piece
7 Spare parts
7.1 Burner 1 set
7.2 Fuel Filters 6 sets
7.3

 

All other spare parts                     required for replacement during and after 12 months of operations. 2 pieces of each
8               Quality Standards  
8.2

 

Manufacturing standards NEMA Kenya Act, 1999

Legal Notice No.121 of 29th September 1999 on waste Management Regulations

EU waste incinerator Directive- EC 76/2000

BS 3316

WHO Emission Standards

World Bank Emission Standards

or any other internationally recognized standards

Conformity to standards CE marked or any other internationally recognized documents
9         Local back up service
9.1 Available Should be available locally
9.2 Capacity to service equipment Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance   service and spare parts sales for the lifespan of the incinerator
10         Delivery point  
10.1 KEMSA For inspection and verification
10.2

 

Moi Voi, Makindu

Maragua, Eldama Ravine and Isiolo Hospitals

For installation, testing, NEMA Certification and commissioning
11 Pre installation works

 

Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12 Installation and testing Complete installation and set up of the incinerator at designated as per manufacturer’s instructions

Provide fuel and test run the incinerator for 3 hours daily for 7 days

13          Training  
13.1

 

User training On site user training on operation and daily up keep
13.2

 

Maintenance training On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14 Technical Documentations  
14.1 User manuals 2 sets
14.2 Service manuals 2 sets
14.3 Drawings 2 sets
15         Commissioning  
15.1 Testing and Commissioning of the machine to the satisfaction of the user
16 Warranty
16.1 Equipment Minimum of one year after commissioning on all parts.
16.2 Equipment system Nil
17.   Maintenance contract
17.2 Comprehensive preventive & repair           service Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (100 – 120kg/hr)

  COMPLIANCE (YES, NO or COMMENT)
Item

Description

Medical Waste Incinerator, 100 to 120 Kg/hr

 

Item Quantity 3 No.
Support East African Networking Project
Point of Installation (Hospitals) Wajir, Kitale, and Busia District Hospitals
  1.     General Description

Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.   The unit shall be capable of incinerating between 100 to 120 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material.

 
  1.   Composition

2.1     Main unit

2.2   Accessories

 
  1.   Performance specifications
 
3.1 Main unit    
3.1.1

 

Application For incineration, general and pathological
3.1.2 Capacity 100 – 120 kg/h burn rate
3.1.3

 

Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4 Operating time Minimum 8 hours daily
3.1.5 Operating temperature From 850 0C to 1200 0C, Automatic controlled
3.1.6 Residual Ash 5 to 10%
3.2     Primary Chamber
3.2.1

 

Construction Constructed from heavy duty mild or aluminized steel

Or equal and approved equivalent

3.2.2

 

Insulation material Refractory material lining similar or equal to calcium

Silicate and hot face combination of heavy duty brickwork

3.2.3

 

Internal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4

 

Charging Door Suitable for manual loading of wastes and with smooth

Dear seal equivalent of Ceramic seals with hinges.

3.2.5 Door Lock Automatic, Electric type
3.2.6

 

Ash removal door Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
3.2.7 Gratings Provided
3.2.8 Loading Manual loading of waste
3.2.9 Primary Burner Fully automatic, with fuel, temperature and speed   controls with ignition system   flame detector                                                           Air fan Complete with safety features, flame failure                                                                     Diesel fired fuel injector type

Flange mounted

3.2.10 Blower Provided. 3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11 Temperature Minimum exit 850 0C
3.2.12 Observation port To be provided with protective glass type
     3.3     Secondary chamber
3.3.1

 

Construction Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2 Insulation Refractory material lining
3.3.3 Combustion Temperatures Above 850 0C, controlled electronically
3.3.4 Gas residue or retention time > 2 second at minimum 850 0C
3.3.5 Secondary Burner Provided,

Diesel fired,

Fully automatic, with fuel, temperature and speed controls

With ignition system

Flame detector

Air fan

Complete with safety features, flame failure

Diesel fired fuel injector type

Flange mounted

3.3.6 Ejector Provided, Venturi type, for cooling the flue gases
3.3.7

 

Combustion Air Fan Provided for supplying combustion and creating a

negative drift and turbulences with variable speed control

3.3.8 Temperature Maximum 1600 0C
3.4         Chimney
3.4.1

 

Construction Constructed from heavy duty mild or aluminized steel   or equal and approved equivalent

Refractory material lining

3.4.2 Length 10 m above ground
3.4.3 Bore about 350mm diameter
3.4.4 Discharge temperatures About 850 0C
3.4.5 Emissions To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
   3.5       Electrical System  
3.5.1 Control unit Fully automatic with microprocessor based control

unit (PLC) automating all operations of the incinerator

Capable of monitoring all incinerator parameters

With large LCD or similar for display of all progress

Parameters i.e. temperature of primary and second chambers , turbulence and time

With status lamp

With user of defined and differed programmed operating cycles for different type of loads/conditions

With safety interlocks, display of errors and visible and audio alarms.

System for continuous emission monitoring

3.5.2 Isolator switch Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3

 

Distribution Board Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring   to be done according IEE regulations.
3.5.4

 

Wiring Make provisions for wiring the isolator switch,

Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.

Working length 20m.

Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations

3.6     Fuel System
3.6.1 Fuel Tank Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable

suitable metallic material or high temperature

resistance material

Fuel type Diesel
3.6.2

 

Fuel Lines Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator. Working length , 20m
Fuel pipe material Special copper pipes or similar and approved materials
  1. Physical characteristics
 
4.1 Main unit Floor mounted, stand alone, fixed hearth type
Dimensions About 2.5 x 2.8m (WxD)
  1.   Operating environment  
 
5.1 Power Requirements 415V, A/C 50Hz, Three phase, with PE
Ambient temperature 10 0C to 40 0C
Relatively humidity 40% to 90%
6               Accessories  
6.1 Rack, 2 m long 1 piece
Waste cart, stainless steel 1 piece
  1. Spare parts
 
7.1 Burner 1 set
7.2 Fuel Filters 6 sets
7.3

 

All other spare parts                 required for replacement during and after 12 months of operations. 2 pieces of each
8               Quality Standards  
8.2

 

Manufacturing standards Environmental Management and Coordination Act, 1999

Legal Notice No.121 of 29th September 1999 on                                                                           waste Management Regulations

EU waste incinerator Directive- EC 76/2000

BS 3316

WHO Emission Standards

World Bank Emission Standards or any other internationally recognized standards

Conformity to standards CE marked or any other internationally recognized documents
9           Local back up service  
9.1 Available Should be available locally
9.2 Capacity to service equipment Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance   service and spare parts sales for the lifespan of the incinerator
10         Delivery point  
10.1 KEMSA For inspection and verification
10.2

 

Moi Voi, Makindu

Maragua, Eldama Ravine and Isiolo Hospitals

For installation, testing, NEMA Certification and commissioning
11 Pre installation works

 

Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12 Installation and testing Complete installation and setup of the incinerator at designated as per manufacturer’s instructions

Provide fuel and test run the incinerator for 3 hours daily for 7 days

13          Training  
13.1

 

User training On site user training on operation and daily up keep
13.2

 

Maintenance training On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14 Technical Documentations  
14.1 User manuals 2 sets
14.2 Service manuals 2 sets
14.3 Drawings 2 sets
15         Commissioning  
15.1 Testing and Commissioning of the machine to the satisfaction of the user
16 Warranty
16.1 Equipment Minimum of one year after commissioning on all parts.
16.2 Equipment system Nil
  1. Maintenance contract
17.2 Comprehensive preventive & repair           service Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Integrated Hospital Waste Management

incenratory

Gilgit-Baltistan Environmental Protection Agency intends to mange hospital waste through piloting of three major districts headquarter hospitals (Hunza/Nagar, Skardu, Chillas and Gilgit and city hospital Gilgit) through integrated Solid/Biomedical Waste management.

 

For this purpose GBEPA has planned to procure solid/biomedical waste incinerators with other necessary equipment through open competitive Single stage (two envelop technical and financial) bidding as per PPRA Rules on the criteria as under:

incinerators

pet crematorium china to bay, animal cremator equipment,

 

 

All bids will be evaluated under Single stage two envelope bidding
procedures, 

The bidders will be evaluated on technical and financial grounds.

Price will be taken into account after technical evaluation.
1. CRITERIA FOR TECHNICAL EVALUTAION

For technical evaluation the bidder/firm has to be evaluated under the following criteria;

  1. Relevant past experience of establishment of integrated solid/bio-medical waste management system
  2. Capabilities with respect to personnel, equipment, technical expertise, and supply networ
  • Appropriate capacity building opportunities

 

  1. Repair and maintenance of equipment and machinery to be supplied

 

  1. Capacity building of staff to operate machinery/equipment

 

  1. Manufacturing/ dealerships within Pakistan

 

  • Financial strength of bidder/firm
  • Technical, financial capabilities with adequate managerial capabilities of the fir

 

  1. Legal status of firm, blacklisting /any litigation in any court of law within Pa
  2. The bidders have to submit bidding documents in a sealed package with Single Stage two envelop bidding (technical and financial).
  3. Technical and financial Evaluation committee reserves the right to accept or reject any or all bidders/firms without assigning any reason there
  • The evaluation of Bids will be based on technical evaluation by the Evaluation Committee which is based on 500 points (100 points for each technical capacities)

TECHNICAL EVALUATION POINT 500

incenratory

S# Technical Expertise Maximum Points Points obtained
 

01

Past     experience     and   proof   of     Installation       &operation/manufacturing/distribution of integrated solid/bio-medical waste Incinerators in working conditions in any public sector hospitals in Pakistan  

100

02 Personnel, equipment, technical expertise,manufacturing /dealership of machinery within Pakistan. 100
03 Capacity building opportunities for running andmaintenance of machinery/equipment (Trainings of hospital staff) 100
04 Repair Maintenance of machinery and equipment aftersale and service facility 100
05 Financial strength of firm/bidder 100

 

 

After acceptance of technical and financial bids the bidder/firm has to supply the equipment/machinery as per specifications provided by GBEPA, equipment will be supplied on respective districts as per agreement with 30 days of the issuance of supply order.

 

  1. Equipment List

Following is the list of Machinery and Equipment

  1. Incinerators 05 Nos
  2. Primary Waste Collection Bins Sets (Red, Yellow, Green) Bulk
  • Secondary Containers (Red, Yellow, Green) Bulk
  1. Tertiary Containers Eight (optional)
  2. Personal Protective Equipment (PPEs) Bulk
    1. Gloves
    2. Masks
    3. Shoes
    4. Coverall (protective Clothing for waste handling workers)

 

VI. Trolleys for Waste Transfer Thirty
VII. Signage’s Bulk
VIII. Standard shovels or tools for waste loading/unloading Bulk
IX. Tagging Bags for waste handling at primary level Bulk
3. Specifications

12

Following are the detailed specifications and terms and conditions for each equipment / machines;

  • Incinerator:

Chamber                                           Double

Burning Rate                                  10 kg per hour (for two incinerators)

Burning Rate                                  20 kg per hour (for three incinerators)

Loading Method                          Manual

No of Burners                                Single for 10 kg/hour and Double for 20 kg per hour Fuel       Diesel and Natural Gas

Warm Up Time                              Not more than 20 minutes

Temperature controller          Digital

Power Supply                                 Single Phase 220V

Chimney Height                            20 feet from ground level

Wet and Dry Scrubbers           Optional

 

Terms and Conditions for Incinerator Supply:

 

  • General

 

  1. Bidders shall provide 5% of the total cost as bid securit
  2. Bidders are   required   to    provide    warranty    of    the    equipment    as    per recommendations of the Original Equipment Manufacturer (OEM).

 

 

  • Bidders should provide printed brochures of the equipment elaborating details of specifications, brand name, model and capacity etc.

 

  1. Bidders / firms should also provide proof of past experience of establishment of hospital waste management system and piloting with training and capacity building of procuring agency /authorities with proof of dealership within Pakistan and availability of spare parts in fut

 

  • Specific
    1. Installation and Operation:

 

  1. Transportation and installation at selected points in the project are
  2. Construction of civil infrastructure as per requirement of the Incinerators, transfer and transport system in consultation and consent of GB-EP
  3. Fixing of incinerators at designated sites with standardized procedures as per agreed by GBEP
  4. Technical testing of the installed incinerators for minimum of two week
  1. Training:
    1. Develop standard operating procedures in consultation with GBEP
    2. Develop training module for plant operator’s in-lines with agreed SOPS.
    3. Impart training to Hospital Plant operators (incinerator operators).
  • Maintenance:
    1. Develop manual for minor maintenance for troublesh
    2. Provide basic accessories required to maintain operation as spare parts of the equipmen
    3. Provide one year free of cost maintenance of the system according to the warranty provided by OEM
  1. Work Plan/Documentation
    1. Provide detailed work plan including BOQ’s (bill of quantities).

 

  1. Submit detailed design of the each project with spe

 

  1. Submission of project completion report

 

  1. Financial Plan
    1. 50% of the approved tender cost will be given on transportation and installation off machinery/equipment at project
    2. 30% of the remaining cost will be paid on completion of II & III.
    3. 20% will be paid after satisfactory results of the project or mutual agreement of both partie

 

  • Specifications for Primary and Secondary Waste Collection Bins:

Color                           Red, Yellow and Green

Material                      Plastic or Composite

Strength                      Strong enough to handle waste

Made                           By any reputed company

 

  • Specifications for Waste Transfer Trolleys

Color                           Any

Material                      Metallic

Strength                      Strong enough to carry waste of 10 kg to a distance of 100 meters

Made                           By any reputed company

  • Specifications for Signage’s

Signage’s and billboards of standard designs and material for installation at various locations of Hospitals carrying waste handling and awareness messages.

 

  • Specifications for PPE’s

Gloves, Masks and Safety shoes made by any reputed company complying international safety standards.

 

  • Specifications for Standard Shovels or Tools for Waste Loading / Unloading

Metallic or any other standard material made any reputed company

 

  • Specifications for Tagging Bags

Plastic bags with printed identification of the purpose of infectious waste handling at primary level

Clover's Social Media