Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Medical Waste Incinerator of 20 kg/hr capacity with dual burner

3 Medical Waste Incinerator of 20 kg/hr capacity with dual burner.Medical Waste Incineration Systems. i’m interested to destroy about 200 kg remains. a Medical Incinerator project for Tehran municipality. Our purpose for this project is to establish a plant in order to incinerate Medical waste with 50 ton/day capacity. a incinerator with 100 kg / hour burning capacity. And it should work on diesel fuel, 2 chamber. Waste management
Incinerator
*External diameter at base 6ft 1.8m
*External diameter at top 4 1/2ft 1.35m
*Internal diameter at base 3ft 0.9m
*Internal diameter at top 3ft 0.9m
*Thickness of wall at base 18cm
*Thickness of wall at top 9cm
*Perpendicular height of wall 4ft
*Height of Iron bars from grate above ground 1ft

Material Required
*Puddle swish
*5 or 6 Iron bars about 4 1/2ft 1.35m long each
*Quantity of large stones for foundation
*2 empty kerosene tins for making vent holes
*2ltrs of coal tar
*2 brushes
*Foundation 1ft-1 1/2ft deep is dug
*Filled with large stones and puddle swish to ground level
*Empty kero tins are next placed into position where the vent holes are to appear
*Wall 1ft high is built with puddle swish
*Iron bars are put in position leaving a space of about 2cm-3cm between the bars 4ft 1.2m to be reached
*Wall plastered smooth.Incinération à haute température pour la destruction complète des déchets contaminés ou dangereux.
Principe de combustion pyrolytique avec brûlage des fumées dans une chambre de post-combustion
Incinérateur double chambre 900°C/1200°C de capacité 30 kg.
Equipé de : 1 brûleur de combustion + 1 brûleur de re-combustion + 1 laveur de fumées. Capacité de destruction horaire
En poids : au moins 30 kg
En volume : au moins 200 litres
Température :
Combustion : 900°C
Post combustion : 1200°C
Puissance des brûleurs
Combustion : au moins 80 KW
Post combustion : 80 KW
Puissance électrique : environ 2 KW
Cheminée :
Section : environ 30×30 cm
Hauteur (minimum) : au moins 8 m
Dimension de la porte de chargement : environ 50X50 cm

incinerator small to medium waste dispossal

Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération. incinerator small to medium waste dispossal for about 150-200 municipal waste from shopping mall, office and residential.

The waste most consist of vary materials plastics, rubber, paper, grass, leaves, woods, fruits, packaging carton, and many others

Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois
Carburant Diesel
Capacité (M3) 1.18
Ave Capacity 750 kg
Consommation (l/h) 6
Dimension externes
Longueur (mm) 3110
Largeur (mm) 1800
Hauteur (mm) 3300
Ouverture Porte 770×2000
Dimension internes
Longueur (mm) 2100
Largeur (mm) 700
Hauteur (mm) 800
Opération. incinerator small to medium waste dispossal for about 150-200 municipal waste from shopping mall, office and residential.

The waste most consist of vary materials plastics, rubber, paper, grass, leaves, woods, fruits, packaging carton, and many others

Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire secs
garantie minimum 12 mois.a small animal crematorium, styles and prices

Sudan Medical waste Treatment Scheme

•    A burn rate of 25 – 30kg/hr.
•    Consists of two chambers to ensure significant reduction of emissions and be capable of temperatures in the range of 800-1000˚c.
•    Incinerator must be of a low maintenance design, be diesel fuelled and need no more than 15 amp 220-250 V power. KW consumption per hour should be stated.
(1)  What  are  main  differences  between  medical  incinerators:    YD-10C  and  TS10(PLC)?
(2)  After  combustion,  the  medical  waste  becomes  smoke?  Without  smell?  No  pollution?
(3)  What  should  we  do  to  release  the  smoke?    Prepare  a  pipe  to  direct  the  smoke  to  factory  outside?
(4)  Any  operation  guide  for  reference,  we  worry  that  it’s  difficult  to  operate?
•    The incinerator should also be able to run off a generator.
•    The incinerator should have option of tank and should use no more than 12L of diesel fuel per hour to burn 25- 30kg of waste.options for medical waste incineration for Kabul, Afghanistan
•    Design must be such to minimize risk to operators and have a simple start sequence to minimize operator training and skills
•    Solid waste reductions in the range of 90 – 97% should be routinely achieved.a central thermal treatment station in the city of Khartoum (9 million inhabitants) we started with two units of autoclave that treat up to 18 tons a day so far, and looking forward to add an incineration plant/s to serve for medical, pharmaceutical, and hazardous waste.

Afterburner Preheat Incinerator

PRIMARY CHAMBER

Heavy-duty steel casing

High quality refractory lining and insulation Large full size top load counterbalanced door
1 x oil/gas fired ignition burners operated on/off

SECONDARY CHAMBER

Heavy-duty steel casing

High quality refractory lining and insulation 2 second gas residence time
1 x oil/gas fired ignition burners operated on/off

CHIMNEY

Heavy-duty stainless steel casing

CONTROL PANEL

Control of primary and secondary burners Temperature Monitoring with 4 digit display Thermostat control device for burner (fuel saver) Timer control 0- 12 hours

Integral fan timer control

Technical Specifications

Fuel
Diesel

Capacity
900kg (1.35m³)

Burn Rate
150kg/h

Avg Ash Residue
3%

Avg Fuel Consumption p/hr
20ltr

Operation
Min. Operating Temperature    950°C
Max. Operating Temperature    1320°C
Residency Time in Secondary Chamber    2 Seconds
Temperature Monitoring    YES

ANCILLARIES

Operating and maintenance manuals Spares list

KEY FEATURES

•Afterburner Preheat

•Incineration temperatures in excess of 1300°C

•5mm steel casing and fully insulate

•Dense refractory concrete lining rated to 1600°C

incinerator for medical waste

GENERAL SPECIFICATIONS FOR INCINERATORS

Primary and secondary burners: Separate electrically spark-ignited primary burners and secondary burners with automatic control shall be used to achieve the specified temperature requirements in the primary and secondary chambers. The flames  of the primary and secondary burners shall not impinge on the incinerator walls or floor.
The primary combustion chamber must:

1.    Be accepted as the primary combustion zone.
2.    Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels.
Other combustion methods will be judged on merits.

3.    Ensure primary air supply is controlled efficiently

Ensure minimum exit temperature is not less than 850oC

Air supply: Air supply in the primary and secondary chamber should be regulated between 30%-80% and 170%- 120% of stoichiometric amount respectively. Suitable flow measurement devices shall be provided on the primary and secondary air ducting. The combustion air shall be supplied through a separate forced draft fan after accounting for the air supplied through burners.The secondary combustion chamber must:

1.    Be accepted as secondary combustion zone.
2.    Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.

3.    Ensure secondary air supply is controlled efficiently.

4.    Ensure flame contact with all gases is achieved.

5.    Ensure residence time is not less than two (2) seconds.
6.    Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.

7.    Ensure the oxygen content of the emitted gases is not less than 11%.
Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted

lnsulation: lnsulation to be used for masonry, reinforced concrete, or non-combustible material shall prevent damage to the foundation from excessive heat and shall be of a thickness to limit the outer casing to a maximum temperature of 66°C in an ambient temperature of 21°C when the incinerator is operating at full capacity.

Refractory: Refractory shall be #super duty# and heat-resistant to a minimum of 1100°C in the primary chamber and 1250°C in the secondary chamber. Refractory shall also be abrasion resistant in the prlmary chamber, constructed of plastic or castable type refractory, designed to prevent bulging and destruction due to heat stress, capable of supporting more than twice the hourly burning rate and preventing leakage of fluids, and with a minimum thickness of 11O mm for walls and hearths

Clover's Social Media